Case Studies

Case Study: Engineering a 75 MGD Bypass at the North District Wastewater Treatment Plant

Case Study: Engineering a 75 MGD Bypass at the North District Wastewater Treatment Plant

When the North District Wastewater Treatment Plant in North Miami, FL needed a 75 MGD bypass, the obvious approach was off the table. The plant’s effluent chamber could not support the weight of bypass equipment. Nothing could rest on the structure. IRONCLAD Powered by Mersino answered with an engineered solution built from the ground up, […]

Learn More
11 Tanks, 3 Pumps, One Day: How IRONCLAD Powered by Mersino Delivered a Complete Equipment Setup Under a Tight Timeline

11 Tanks, 3 Pumps, One Day: How IRONCLAD Powered by Mersino Delivered a Complete Equipment Setup Under a Tight Timeline

When a project requires a large-scale equipment setup on a tight timeline, coordination and experience make all the difference. See how IRONCLAD’s Oklahoma City team mobilized 11 tanks, 3 pumps, and a poly cube in a single day to deliver a complete, ready-to-operate solution.

Learn More Poly Cube, Pumps, Tanks
32 Miles to the Water. Zero Compromises.

32 Miles to the Water. Zero Compromises.

Project Snapshot Industry Pipelines and Terminals Application Hydrotesting Location Mojave Desert, California Water moved Approximately 2.7 million gallons Source distance 32 miles from the work site Assets deployed 60,000-barrel IronMax tank, 30 21,000-gallon frac tanks Site condition Environmentally sensitive, no municipal water access

Learn More Hydrotesting, Pipelines
Multi-Segment Pipeline Hydrotest: Staging and Reusing Water Across Five Remote Sites

Multi-Segment Pipeline Hydrotest: Staging and Reusing Water Across Five Remote Sites

A midstream pipeline operator was completing a new gathering line buildout across a remote stretch of the Permian Basin. The work included five separate hydrotest segments, each requiring a specific staged water volume held under pressure for the standard hold period before the next segment could move forward.

Learn More Hydrotesting
Inside the Data Center Response: How IRONCLAD Powered by Mersino Supports Hyperscale Operators Through Cooling Failures and Capacity Surges

Inside the Data Center Response: How IRONCLAD Powered by Mersino Supports Hyperscale Operators Through Cooling Failures and Capacity Surges

The typical data center operator Ironclad works with runs a hyperscale or large enterprise facility, often part of a multi-site campus, somewhere between 100,000 and several million square feet. These facilities operate 24/7 under strict service level agreements with their end customers, and they depend on continuous cooling to keep server hardware within safe operating […]

Learn More Emergency response
Dewatering Near the Ocean’s Edge: Ironclad Frac Tanks Support Construction of Underground Parking in Florida

Dewatering Near the Ocean’s Edge: Ironclad Frac Tanks Support Construction of Underground Parking in Florida

Construction projects in Florida often require extra care and consideration — with a high water table, dewatering is a necessity before work can truly begin. In Delray Beach, mere feet from the ocean, plans were in place for a new hotel and underground parking deck, but would require more dewatering support than originally anticipated. When […]

Learn More Construction solutions
The Eye of the Storm: Ironclad acts fast to mobilize emergency response after Hurricane Ian

The Eye of the Storm: Ironclad acts fast to mobilize emergency response after Hurricane Ian

When Hurricane Ian made landfall in 2022, the deadly storm caused $113 billion worth of damage and left communities in Florida and the Carolinas facing unthinkable devastation. As emergency response contractors and government agencies scrambled to find vital equipment and activate support, the Ironclad team mobilized three East Coast branches to establish an immediate and […]

Learn More Emergency response
Ironclad Provides Rapid Response in T-Oil Spill

Ironclad Provides Rapid Response in T-Oil Spill

In late summer of 2025, Ironclad’s Baltimore team received a call at 7 p.m.: A transformer had exploded on a job site in D.C., causing a major spill of T-Oil, a substance that is recordable in quantities as small as an ounce—so 250 gallons required urgent response to minimize contamination. Frac tanks and roll-off boxes […]

Learn More Emergency response