Case Studies

Containing a major chemical upset in 48 hours

Containing a major chemical upset in 48 hours

Snapshot Industry served: Gulf Coast petrochemical Response window: 48 hours Equipment staged: approximately 125 roll-off boxes Time on rent: 22 months A process that upset a longtime Gulf Coast chemical partner sent product into parts of the facility it was never meant to reach. The contamination was severe enough to force a three-month shutdown, with […]

Learn More
Case study: a same-day pump rig on a recovery barge after a vessel went down near Baltimore

Case study: a same-day pump rig on a recovery barge after a vessel went down near Baltimore

When a vessel went down near Baltimore, the salvage could not move until there was pumping support on the water. There was no lead time and no second day to catch up. IRONCLAD Powered by Mersino answered with a pump unit and a Baltimore crew that rigged it, craned it onto the recovery barge, and […]

Learn More
Case study: engineering a 75 MGD bypass at the North District Wastewater Treatment Plant

Case study: engineering a 75 MGD bypass at the North District Wastewater Treatment Plant

When the North District Wastewater Treatment Plant in North Miami, FL needed a 75 MGD bypass, the obvious approach was off the table. The plant’s effluent chamber could not support the weight of bypass equipment. Nothing could rest on the structure. IRONCLAD Powered by Mersino answered with an engineered solution built from the ground up, […]

Learn More
11 tanks, 3 pumps, one day: How IRONCLAD Powered by Mersino delivered a complete equipment setup under a tight timeline

11 tanks, 3 pumps, one day: How IRONCLAD Powered by Mersino delivered a complete equipment setup under a tight timeline

When a project requires a large-scale equipment setup on a tight timeline, coordination and experience make all the difference. See how IRONCLAD’s Oklahoma City team mobilized 11 tanks, 3 pumps, and a poly cube in a single day to deliver a complete, ready-to-operate solution.

Learn More Poly Cube, Pumps, Tanks
32 miles to the water. Zero compromises.

32 miles to the water.
Zero compromises.

A major pipeline operator needed approximately 2.7 million gallons of water for hydrotesting in a remote, environmentally sensitive area of the Mojave Desert. With the nearest water source 32 miles away and no municipal access, Ironclad Powered by Mersino provided the storage, equipment, and logistics needed to get the job done safely and on schedule.

Learn More Hydrotesting, Pipelines
Multi-segment pipeline hydrotest: staging and reusing water across five remote sites

Multi-segment pipeline hydrotest: staging and reusing water across five remote sites

A midstream pipeline operator was completing a new gathering line buildout across a remote stretch of the Permian Basin. The work included five separate hydrotest segments, each requiring a specific staged water volume held under pressure for the standard hold period before the next segment could move forward.

Learn More Hydrotesting
Inside the data center response: How IRONCLAD Powered by Mersino supports hyperscale operators through cooling failures and capacity surges

Inside the data center response: How IRONCLAD Powered by Mersino supports hyperscale operators through cooling failures and capacity surges

The typical data center operator Ironclad works with runs a hyperscale or large enterprise facility, often part of a multi-site campus, somewhere between 100,000 and several million square feet. These facilities operate 24/7 under strict service level agreements with their end customers, and they depend on continuous cooling to keep server hardware within safe operating […]

Learn More Emergency response
Dewatering near the ocean’s edge: Ironclad frac tanks support construction of underground parking in Florida

Dewatering near the ocean’s edge: Ironclad frac tanks support construction of underground parking in Florida

Construction projects in Florida often require extra care and consideration — with a high water table, dewatering is a necessity before work can truly begin. In Delray Beach, mere feet from the ocean, plans were in place for a new hotel and underground parking deck, but would require more dewatering support than originally anticipated. When […]

Learn More Construction solutions