11 Tanks, 3 Pumps, One Day: How IRONCLAD Powered by Mersino Delivered a Complete Equipment Setup Under a Tight Timeline

11 Tanks, 3 Pumps, One Day: How IRONCLAD Powered by Mersino Delivered a Complete Equipment Setup Under a Tight Timeline

When a project requires a large-scale equipment setup on a tight timeline, coordination and experience make all the difference. See how IRONCLAD’s Oklahoma City team mobilized 11 tanks, 3 pumps, and a poly cube in a single day to deliver a complete, ready-to-operate solution.

At a glance

  • Location: Oklahoma City metro
  • Team: OKC branch
  • Assets deployed: 11 tanks, 3 pumps, 1 poly cube
  • Timeline: Single day

The Challenge

Some jobs are measured by what gets done before the day is over. This one came down to a full complement of equipment, 11 tanks, three pumps, and a poly cube, staged and connected on site in a single day.

A set this size is a coordination test as much as a labor one. Fifteen assets have to land in the right place, in the right order, and be ready to work by the time the crew clocks out. There is no room to fall behind and no second day to catch up.

The Response

IRONCLAD Powered by Mersino brought a complete equipment package to the site and the OKC crew to put it in place. Eleven tanks for storage, three pumps to move liquid, and a poly cube rounded out the set, sized and positioned to work together as a single system.

The OKC team handled the full scope, from spotting and placing each asset to connecting pumps and confirming the set was ready to run.

Tanks lined up on jobsite

Execution

The work happened fast. Setting eleven tanks alone is a full day for many crews. The OKC team set all eleven, placed three pumps, and added a poly cube in the same day, sequencing each piece so the next could follow without backtracking.

That pace comes from planning and teamwork, not shortcuts. Every asset went in deliberately, positioned for access and connection, with the crew working together to keep the set moving from first tank to last.

The Outcome

By the end of the day, the full set was in place and ready to work: eleven tanks, three pumps, and a poly cube, delivered and operational in a single shift. It is the kind of set that shows what the OKC team can do when the timeline is tight and the scope is large.